MOSTYSHCHE FORMER SCHOOL

Project status: on-going

Overall Completion Date: October 10th 2022

Area: 150 m2

Total capacity: 30 people (disabled orphans and foster family

Estimated cost: 103 000 USD

The project will refurbish and repurpose a disused village school
building to accommodate 24 DISABLED ORPHANS WITH CARERS
AND A FOSTER FAMILY OF 6 from Severodonetsk, where their homes have been destroyed and occupied by russia.

Scope of work: upgrade power supply from 7KW to 50KW. Complete rewire. Install convector heaters. Drill well to depth of 30m for water. Install 6 showers and 7 toilets. Install 4m3 bio septic tank. Refurbish and insulate floors and ceilings. Full redecoration.